Fin tube radiator with flange is favored in many places due to its excellent heat dissipation performance, and the correct installation steps are the key to ensure its efficient operation and function. The following is a detailed introduction to the installation process.

1. Preparation before installation of fin tube radiator.

First, according to the area of ​​the place of use, heating or heat dissipation requirements and other factors, determine the specifications and quantity of the required finned tube radiator with flange.

At the same time, check whether the finned tube radiator itself has any appearance damage, whether the fins are deformed, etc., to ensure its quality is intact.

În plus, prepare the corresponding installation tools, such as wrenches, screwdrivers, levels, etc., as well as matching flange gaskets, bolts and other connectors, to make full preparations for subsequent installation.

2. Determine the installation location of the fin tube radiator.

If it is used for indoor heating, generally choose places close to exterior walls, windows and other places that are easy to dissipate heat, so as to better balance the indoor temperature and reduce the phenomenon of uneven heat and cold.

In places such as industrial plants, it is necessary to reasonably determine it based on the overall layout and the direction of the heat medium pipeline to ensure that the heat can evenly cover the required area.

At the same time, use a level to ensure that the installation position is in a horizontal state to avoid affecting the subsequent use effect due to tilting.

3. Fix the finned tube radiator.

Move the finned tube radiator with flange to the predetermined position, align the flange with the corresponding pipe flange, and place a sealing gasket in the middle to ensure the sealing of the connection and prevent heat medium leakage.

Then, use bolts to pass through the flange holes and tighten the bolts step by step in the order of diagonal lines to firmly install the radiator in the corresponding position, but be careful to avoid over-tightening to cause flange deformation.

4. Connect the finned tube radiator to the heat medium pipeline.

Properly connect the water inlet and outlet pipes of the heat medium to the corresponding interfaces of the radiator respectively. During the connection process, pay attention to sealing. Auxiliary materials such as raw tape can be used to ensure that the pipes are tightly connected and the heat medium can flow into and out of the radiator smoothly.

5. Debugging and inspection after the installation of the finned tube radiator.

Turn on the heat medium supply system, observe the operation of the radiator, check whether there are any abnormal phenomena such as water leakage and air leakage, and check whether each connection part is firm. If any problems are found, adjust and repair them in time to ensure that the finned tube radiator with flange can play its heat dissipation function normally and stably.

Following the above steps, you can successfully complete the installation of the finned tube radiator with flange, laying the foundation for creating a comfortable and warm environment.

Cangzhou Datang Steel Pipe Co., Ltd is located in Yanshan County, Cangzhou City, Hebei Province. We Manufacturing extruded fin tubes, embedded G type fin tubes, High frequency welded spiral fin tubes, low fin tube, laser welded fin tubes, L / L L / K L fin tubes, Internally fin tubes, elliptical fin tubes, longitudinal fin tube, serrated fin tubes.

All of thse are used for energy saving and environmental protection parts and equipment. Datang has 20 years of production experience, and through the I S 0 9 0 0 1 international quality system certification. All our products have passed the water pressure test and the fin welding strength pull test. These fin tubes are 100% fully loaded to ensure quality. These fin tube have pressure resistance, corrosion resistance, and oxidation resistance protection.

We have professional engineer support, efficient sales team and competitive price advantage, which attracts customers from all over the word. After several years of development, we have made great progress, we are equipped with laser welding machines, high frequency welding machines, rolling welding machines, tensile testing machines, water pressure testing environment and corrosion testing laboratory.

Our R & D department provides strong technical support, enabling us to receive some operation and maintenance projects.

We can produce at least 10000 fin tubes per day. We are a reliable supplier of fin tubes and heat exchanger with a one year warranty.

We look forward to more cooperation. Email:[email protected],Whatsapp:+86 15690122018

Prev:

Următor:

Leave a Reply

Drept de autor © 2024 www.dtfinnedtube.com Toate drepturile rezervate.

Telefon +8615690122018

LinkedIn LinkedIn

Skype trăi:[email protected]

WhatsApp +8615690122018

Cod QR WeChat WeChat

QQ 939249279

E-mail [email protected]

Înapoi sus Înapoi sus

WeChat

WeChat QR Code

Scanați codul QR cu WeChat

Lasă un mesaj